Skip to main menu

Skip to my shopping bag

Skip to main content

Skip to footer links

Trojan Technologies
  • Resources
Parts & Services
Trojan UV Logo
aquafine Logo
viqua Logo
aquafides Logo
Ariafiltra Logo

Trojan Technologies

Continually advancing water treatment, meeting the demands of an ever-changing world.

Resources

HomeAbout UsCareers

Policies

Accessibility PolicyTerms & Conditions of SaleCopyright Terms and ConditionsDigital Services Terms and ConditionsPatentsQuality PolicyEHS Policy

Customer Service

Residential ServiceCompliance and Safety Data SheetsProduct ManualsContact Us

©2026 Trojan Technologies Group ULC. All rights reserved.

|

Privacy PolicyCookie PolicyCookie SettingsDo Not Sell or Share My Data
Case Study | Peru Gold Mine – Aria Fast Mobile Water Solutions | Trojan Technologies
Case StudyAria Filtra

High-Efficiency Mobile Membrane System Rapidly Restores Gold Mining Plant and Protects Environment

A remote gold mine in Peru rented Mobile Water units to treat contaminated leachate water, protect existing reverse osmosis (RO) membranes, and meet environmental guidelines.

Aria FAST Mobile Trailer

Talk to an Expert

If you're looking for reliable and durable filtration solutions that enable mission-critical functions to work as needed, you've come to the right place.

Aria FAST™ Mobile Water Case Study | Peru Gold Mine

The challenge

In 2015, a gold mining plant in Peru with an altitude of 3,000 meters needed to protect its existing RO unit from contaminated leachate water. The plant required a quick, reliable, and high-quality water treatment system to meet peak demands in the summer months and prevent the existing RO membrane from collapsing or releasing contaminated water into the environment. It was also needed to leave a small footprint and operate in challenging geographies.

The solution

The Aria FAST mobile membrane system was chosen to treat the mine leachate, guarantee the availability of a quality water source, and increase overall capacity. Furthermore, its modular, self-contained form removed the need for any new buildings or infrastructure.

The results

Thanks to its deployment speed and ability to meet filtration regulations, the Aria FAST unit increased flow capacity and permeability in the plant, keeping the plant online. The membrane system was a perfect solution to address the challenges of Peru’s strict regulations and the gold mine’s focus on social impact.

thumb-AF-CS

Case Study: High-Efficiency Mobile Membrane System Rapidly Restores Gold Mining Plant and Protects Environment

In 2015, a gold mining plant in Peru with an altitude of 3,000 meters needed to protect its existing RO unit from contaminated leachate water. The plant required a quick, reliable, and high-quality water treatment system to meet peak demands in the...

Water on demand, when and where you need it

Mobile Water Solutions: Aria FAST – MF / UF Systems

Whether you require water treatment for short-term, long-term or emergency relief Aria Filtra's Aria FAST mobile water solution provides a complete, automated membrane system. It requires minimal labor and can be operational within hours of arrival on-site.

Learn More
Aria FAST 80T
Mobile Water Solutions: Aria FAST – MF / UF Systems